About the SGU Municipal Airport Website
Financing
  • $123 million is being funded by the FAA.
  • $37 million is being funded from local sources including sale of the existing airport property as well as miscellaneous city and county revenues.
  • No property taxes, income, or sales tax is anticipated to be used for the City's local share of the cost of this new airport




Location
  • SGU is located five miles south-east of downtown St. George
  • 1203 acre site located in Southwestern Utah approximately 120 miles East of Las Vegas, Nevada.


Runway and Airport Facilities
  • 9,300 ft. (1.8 miles) runway expandable to 11,500 ft.
  • Built on 1,200 acres nearly five times the size of existing airport
  • Two 50 ft. full length parallel taxiways
  • Will meet all FAA safety requirements
  • Construction provides hundreds of local jobs in a difficult economic climate
  • Will accommodate regional jet aircraft, 737s and Airbus 319s
  • Access provided from the new Atkinville Interchange and new Southern Parkway which is part of the proposed regional beltway
  • More room for general aviation and fixed base operations
  • Full ILS instrumentation and navigational aids will be available
  • Completely expandable to allow the City to meet future needs of the community and area
  • Thousands of adjacent developable acres to accommodate economic development activities
  • Opportunities for other destinations and airlines if and when the market dictates
  • Great time to build because of low construction and material costs, with bids coming in at an average of 45% to 50% below 2007 estimates
  • New modern terminal building will be constructed
  • The total cost of the replacement airport is estimated at $160 million
  • Approximately $123 million is coming from FAA grants. These funds are generated by airline ticket sales, user taxes, fuel fees, and are not generated by federal income taxes. These funds can only be used for airport-related projects. Funds are collected nationwide; if the City does not use the approved grants, they will go to another airport project somewhere else in the country
  • Approximately $37.5 million in funding including the local match for the replacement airport is coming from the American Recovery and Reinvestment Act, Washington County Transient Room Tax, City of St. George transportation fund, Water Services Department, Utah State and Institutional Trust Lands Administration (SITLA), Community Development Area (CDA) fund and fees collected at current airport.
  • Single 9.300 foot long and 150 foot wide runway with one full commercial service taxiway and one partial general aviation taxiway - Class D airspace.
  • 34,000 square foot, two story terminal. Special features include a greeting area, an enclosed garden and an architectural style emphasizing the beauty of local geology and vistas.
  • Design includes the latest all-weather instrument approach equipment including a variety of GPS, VOR/DME and ultimately ILS approach with MALSAR.
  • Fueling facilities.





Private Hangar Lease Agreement Draft (PDF)

RFP for Parking Revenue Control System (PDF)
Addendum 01 (PDF)

SGU Replacement Airport
Aircraft Rescue Fire Fighting Facility Plan Holder List (PDF)

SGU Replacement Airport
SGU Paving and Lighting Pre-bid Sign in list (PDF)

SGU Replacement Airport
Paving and Lighting Pre-Bid Sign in Sheet (PDF)

SGU Replacement Airport
Airside Paving and Lighting Plan Holders List (PDF)

View Contractor Bid Amounts (PDF)

View Finish Grading
Contractor Bid Amounts (PDF)